Western Federal Lands Highway Division The edge of a forest along the horizon
About WFLHD Projects Procurement Design Resources A highway stretching off into the distance

  Location: Home > Construction Resources > Construction Management Resources


Construction Management Resources
Manuals
Specifications
Reference Materials
Construction Forms
Computer Programs
Other Resources


 
Related Links
Acronym List
Privacy Policy
Site Map

Computer Programs

  • Engineer's Estimate
    Engineer's Estimate Program created for FHWA.

  • QL-Pay
    One of the homegrown programs used at Western Federal Lands is called QL Pay. Quality Level and Pay Factor Analysis (QL-Pay) is used to track Materials accepted on a statistical basis. QL-Pay is a statistical method used to determine the estimated percentage of a material that falls outside the established specification limits.

  • L LIN
    A program to load on HP48 and HP49 Handheld Calculators to use for stakeout and construction survey verification.
   


Home | About WFLHD | Projects | Procurement | Design Resources | Contact Information

USDOT | FHWA | FLHP | EFLHD | CFLHD | WFLHD

Please send your questions or comments to webmaster@mail.wfl.fhwa.dot.gov
Last update: April 11, 2006