![]() |
![]() |
|
Location:
Home >
Procurement >
Other Information |
|
Current Contract Holders This section provides consultants with information on current contract holders with Western Federal Lands Highway Division (WFLHD). Multi-Discipline Contracts:
These contracts were issued under Solicitation No. DTFH70-05-R-00001, and have a maximum value of $10 million. They may require any or all of the following Architect-Engineer services: Highway Design; Environmental, Geotechnical; Hydraulics/hydrology; Survey and Mapping; Landscape Architecture; Right-of-Way and Utilities; Bridge and highway related Structural Engineering.
Survey & Mapping Contracts:
These contracts were issued under Solicitation No. DTFH70-04-R-00012, and have a maximum value of $5 million. The work may principally be for surveys of highway route segments needed in support of the engineering, design, and development of future construction improvement projects.
Geotechnical Contracts:
These contracts were issued under Solicitation No. DTFH70-05-R-00007, and have a maximum value of $2 million. The work will principally be for geotechnical engineering services needed in support of the engineering design and development of future highway construction improvements.
Hydraulic Contracts:
These contracts were issued under Solicitation No. DTFH70- 06-R-00005, and have a maximum value of $3 million. The contract is in effect for a period of 3 years with an option for an additional two years. The work will principally be for hydrology and hydraulic engineering services (A/E) needed in support of the engineering design and development of future highway construction improvements.
Design Contracts:
These contracts were issued under Solicitation No. DTFH70-01-R-00020, and have a maximum value of $5 million. The work will principally be for engineering and transportation planning services needed in support of the engineering design and development of future transportation improvements. No new design contracts are anticipated. Future needs for highway design work will be met through the Multi-Discipline contracts described above.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Home | About WFLHD | Projects | Procurement | Design Resources | Contact Information USDOT | FHWA | FLHP | EFLHD | CFLHD | WFLHD Please send your questions or comments to webmaster@mail.wfl.fhwa.dot.gov Last update: June 29, 2007 |