Develop Final (95%) design
Proceed with finalizing the design so that it is substantially complete:
- Incorporate comments from 70% review
- Develop responses to 70% review comments
- Finalize approach road design
- Finalize pullouts and parking area design
- Complete Final Road Safety Evaluation
- Complete major structure design support
- Finalize drainage design
- Finalize permanent traffic control
- Finalize temporary traffic control
- Finalize plan and profile sheets
- Finalize project specific plan/detail sheets
Step 1: Incorporate comments from 70% review
Step 2: Develop responses to 70% review comments
Step 3: Finalize approach road design
| Instructions | Resources | References |
| Finalize plan and profile sheets |
| Proposed Pavement Widening, Adhoc Help |
WFLHD Supplement 9.6.5-1, Standard Format for Plans |
|
| Finalize major intersection plans |
| GEOPAK, Approach Road Match line |
WFLHD Supplement 9.6.5-1, Standard Format for Plans |
|
| Finalize cross sections for earthwork, clearing and seeding reports |
| Cross Section Sheets, GEOPAK V8i |
|
|
| GEOPAK, Plot Cross Section Sheets |
|
|
| GEOPAK, Calculating Earthwork |
|
|
| GEOPAK, Earthwork Manipulation Tool |
|
|
| GEOPAK, Clearing Notes |
|
|
| GEOPAK, Generate Clearing Limits |
|
|
| GEOPAK, Slope Stake Notes, FHWA Version 2 |
|
|
| GEOPAK, XYZ Report |
|
AKA, Blue Tops and Rep Tops |
| GEOPAK, Printing reports |
|
|
| GEOPAK, Seeding Notes |
|
|
Step 4: Finalize pullouts and parking area design
Step 5: Complete Final Road Safety Evaluation
Step 6: Complete major structure design support
| Instructions | Resources | References |
| Provide support for final bridge plans. |
|
|
|
| Finalize all wall layout sheets |
| Proposed Cut Wall, Adhoc Help |
|
Structures to provide data for final wall profiles |
| Proposed Fill Wall, Adhoc Help |
|
|
| GEOPAK, Wall link |
|
|
| Proposed Mechanically Stablized Earth, Adhoc Help |
|
|
| Proposed Shored Mechanically Stabilized Earth, Adhoc Help |
|
|
| WFL Proposed Parapet Wall, Adhoc Help |
|
|
| Proposed Gabion Faced Mechanically Stablized Earth, Adhoc Help |
|
|
| Proposed Going To The Sun Road, Adhoc Help |
|
|
| Proposed Soil Nail Wall, Adhoc Help |
|
|
| Proposed Rockery Wall, Adhoc Help |
|
|
| QA/QC Checklist |
|
|
| PS&E Review Comment Spreadsheet |
|
|
Step 7: Finalize drainage design
Step 8: Finalize permanent traffic control
Step 9: Finalize temporary traffic control
Step 10: Finalize plan and profile sheets
Step 11: Finalize project specific plan/detail sheets